Finding the right building contractor is half the battle won in house construction. The other half is paying the right way at the right time. This guide walks you through selecting a reliable contractor and setting crystal clear payment milestones that protect your time, money and peace of mind in Chennai, especially around Padappai and the Oragadam belt.

Why contractor selection matters in Chennai’s micro markets
Padappai and Oragadam are buzzing with plotted communities, villa projects and fast industrial growth. That means many new contractors enter the scene every season. A careful selection process ensures
- the scope and rates match local market realities
- materials and workmanship suit Chennai’s coastal climate
- timelines align with monsoon windows and municipal procedures
If you are evaluating plots inside a planned community like Velammal Garden, your contractor should be comfortable with gated community bylaws, approach road logistics and site handover protocols. Explore the location and community highlights at velammalgarden.com for context when you brief your contractor.
Decide your contract model first
Before you compare people, fix the model you will use. The three common models for individual home builds in Chennai are:
- Turnkey contract
One price covers labour, materials, coordination and delivery up to handover. Good for owners who want a single point of accountability. - Labour only contract
You buy and supply materials. The contractor provides labour and basic tools. Good when you want tighter control on brand selections and can manage procurement. - Item rate or hybrid contract
Predefined rates for each work item. Helpful when scope may evolve or when you want transparent rate cards.
Tip
Choose the model based on your bandwidth. If you are a first time home builder or live away from site, a well scoped turnkey with strong milestone checks is usually smoother.
Shortlisting checklist you can actually use
Create a shortlist of three to five contractors with this quick filter:
- At least three completed homes of similar size and structure within 15 km of Padappai or Oragadam
- Structural references from a licensed engineer or architect who has worked with them
- A stable site team with a named site engineer or supervisor
- Access to skilled trades for RCC, brickwork, plaster, waterproofing, electrical, plumbing, tiles and painting
- Willingness to sign a detailed scope, drawings register and payment schedule
- Comfort with digital updates like weekly photos, measurement sheets and running bills
Due diligence documents to verify
Ask for copies and verify authenticity before you issue any advance:
- Proprietor or company registration and GST details
- PAN and bank account proof that will appear on invoices
- Labour insurance or workmen compensation policy
- Past client references with site addresses you can visit
- Sample bar bending schedules, cube test reports and waterproofing warranties from earlier jobs
Scope, drawings and inclusions
Disputes usually trace back to vague scope. Fix these upfront:
- Latest architectural, structural and MEP drawings with revision numbers
- Clear inclusions and exclusions by trade
example scaffolding type, staging, curing method, waterproofing system, tile brands, painting system, switchgear range - Site establishment plan
access, storage, temporary power and water, debris disposal, safety and housekeeping - Monsoon plan for Padappai weather
pump provision, curing schedule, rain day buffers, material protection
If you own a plot in a planned community like Velammal Garden, add community working hours, movement of materials, gate passes and road cleaning to the scope. Refer to the community information at velammalgarden.com when drafting house rules.
Timeline and buffers that reflect ground reality
Build a bar chart with realistic buffers:
- Foundation to plinth
- Ground floor slab
- First floor slab if any
- Brickwork and plaster
- Services rough in
- Waterproofing and flooring
- Painting and fixtures
- Testing, cleaning and handover
Add weather and festival buffers typical for Chennai. Include dependencies like TNEB approvals, borewell or sump work and lift installation if planned.
The gold standard: payment milestones that protect you
Never front load payments. Tie every payment to measurable progress plus quality checks. A practical schedule for a ground plus one home could be:
- Mobilisation advance 5 percent
Against agreement signing, work program and site establishment. Secure this with a bank account payee transfer and obtain an advance receipt. - Layout, marking and excavation 5 percent
Pay after setting out and excavation is verified against drawings. - Foundation completion 10 percent
Footings, PCC, columns starter, termite treatment and cube test logs checked. - Plinth level completion 10 percent
Plinth beam, backfilling, compaction and anti termite certificate verified. - Ground floor slab RCC 12 percent
Shuttering, steel, electrical sleeves checked by your engineer before pour. Release only after pour and site safety clearance. - Brickwork and lintel 10 percent
Wall lines, door window openings, lintel levels and curing verified. - First floor slab RCC if applicable 12 percent
Same checks as ground floor slab. - Plastering internal and external 8 percent
Check line and level, sand quality, crack control and waterproofing interface. - Waterproofing and terrace finish 6 percent
Ponding test passed and terrace slope checked. - Flooring and skirting 8 percent
Tile brand, laying pattern, slopes in toilets and kitchen verified. - Electrical and plumbing fixtures 6 percent
Boards, DBs, earthing, sanitaryware, pressure tests, trap seals checked. - Painting complete 4 percent
Primer, putty, top coats as per system approved, shade match and touch ups. - Handover and snag closure 2 percent
Pay after final cleaning, tool clearance and snag list closure. - Retention money 2 percent
Hold for the defects liability period of 6 to 12 months to cover latent defects. Alternatively, release against a performance guarantee of equal value.
Adjust percentages to match your build but keep the spirit intact
small advances, measurable progress, engineer sign off, retention.
Running bills, measurements and approvals
Make billing simple and transparent:
- Running account bills every two to four weeks
- Joint measurements with your architect or engineer present
- Photo logs of reinforcement, waterproofing and services before concealment
- Mandatory test records
concrete cubes, sand silt test, brick strength, pressure tests - Variation notes for changes with revised cost and time impact before execution
Quality control and penalties
Quality slips when there is no consequence. Include:
- Liquidated damages per day for delay beyond agreed buffers
- Rework at contractor cost for out of tolerance work
- Brand substitution only with written approval and rate adjustment
- Safety and housekeeping standards with stoppage rights if violated
Material brands and climate fit for Chennai
Whether turnkey or labour only, list preferred systems that work in coastal climate:
- Anti corrosive rebars with proper cover blocks
- Integral waterproofing admixtures and chemical membranes for toilets and terrace
- Anti fungal exterior paints and elastomeric coats for seafacing weather patterns
- UPVC or CPVC plumbing with pressure rating suited to your pump head
- High quality earthing and surge protection for summer storms
Tax and paperwork made easy
- Ensure invoices carry GST where applicable and match bank payee details
- Keep a simple payment tracker linked to milestones, bills and receipts
- Capture warranties for waterproofing, paints, sanitaryware, borewell motor and elevator if any
- Record as built drawings and service routes for future maintenance
Red flags you should not ignore
- Deep discounts without written scope and brand list
- Demands for heavy advance before site establishment
- Unwillingness to share references or test reports
- No named site engineer or frequent crew changes
- Vague start and finish dates without a program
How this fits your Padappai home plan
Padappai offers the rare mix of peaceful living and quick access to industrial corridors. When you build inside a community like Velammal Garden, a disciplined contractor and milestone plan helps you finish faster, keep roads tidy and maintain neighbour comfort. Align your drawings and approvals early, lock materials that are locally available and schedule concrete pours around the monsoon to stay on track.
Simple next steps
- Finalise your contract model and scope annexures
- Shortlist three contractors with local references
- Freeze a milestone based payment plan with retention
- Appoint an architect or independent engineer for periodic checks
- Keep every change documented with cost and time impact
Ready to plan your home on a well connected, DTCP and RERA approved layout in the Padappai Oragadam belt
Review the community details and get in touch through velammalgarden.com for guidance on plots, bylaws and build readiness.
FAQs on contractor selection & payment milestones house construction chennai
How many contractors should I evaluate before finalising
Shortlist at least three with similar size projects within 15 km of your site. Visit at least one live site to observe safety, curing and housekeeping standards.
Is a turnkey contract better than labour only in Chennai
Turnkey is convenient if you have limited time. Labour only offers brand control if you can handle procurement. Either model works when scope, drawings and milestones are detailed and measurement based.
What is a safe advance to pay at the start
Keep mobilisation at 5 percent with a site establishment checklist and work program. Do not exceed this unless there is a special material booking backed by a proforma invoice in your name.
How do I handle changes during construction
Use a written variation note for each change. Capture revised scope, rate, quantity and time impact. Bill variations only after measurement and approval, not as lump sums.
Why keep retention money and for how long
Retention protects you from latent defects that appear after handover. Keep 2 to 5 percent for 6 to 12 months or take a performance guarantee of equal value at handover.
Building your dream home is smoother when selection and payments are system driven. Use this framework, adapt the percentages to your scope and keep documentation tight. For plot options and community support that make construction simpler, start at velammalgarden.com today.